Friday, October 17, 2008

Work Done VS Time


I thought of this graph during my research and statistics lecture. Feeling mathematical, I drew it using the paint programme.

The Y-axis represents the amount of work done by a student and the X-axis represents the time elapsed. The blue imaginary line is complacency - where the student believes that he/she has studied enough and begins to slacken. The red imaginary line signifies stress - where the student feels the pressure from the need to get things done.

Doesn't it look like some hormonal curve?

No comments: